|
CLIENT/LOCATION
Thomas O’Connor Co., Inc.
Boston Edison
New England Power
Brayton Point
Northeast Utilities
Norwalk Harbor
MCT Corrosioneering
Dubai, UAE
Sencorp System, Inc.
Hyannis, MA
Jacksonville
Electric Authority
St. John’s River Power Park
Norton Company
Worcester, MA
Northeast Utilities
Montville Station
Northeast Utilities
Devon Station
New England Power
Manchester Street Station
Commonwealth Electric
Canal Station
WR Grace
Nashua, NH
Genetics Institute
Andover, MA
|
CONTACT
Ken Snee
617-389-6988
Dave Barret
508-678-8321
Al Taurel
203-665-3486
Bill Craven
592329
Ed Chlebek
508-771-9400
ext. 7336
Frank Thomas
904-633-4513
Miguel Ferre
508-795-5000
Lee McFalls
203-848-9248
Jack Ranney
203-665-5485
Stephen Geary
401-455-3610 ext. 234
Mike Murphy
800-642-7030
Chris Long
Ed Brodeur
603-888-2320
Andy Borella
Pat Sacco
508-475-9214
|
DESCRIPTION
Concrete chemical trench
Coal hoppers / concrete-to-stainless interface
Extremely aggressive sulfuric acid tank and spillage
containment area
Concrete - high acid erosion
Concrete floor of chemical storage area
Chemical make-up trench and concrete overflow tank
Concrete containment area
Concrete floor rebuilding and coating. Concrete sump chambers
and neutralization basin.
Neutralization basin
Concrete floor demineralizer area
Concrete floor demineralizer area
Concrete containment area, pump bedistals, acid tank storage
floor
Demineralizer floor repair
|