Application
Instructions
Preparation:
Broom sweep roof. Remove mildew
with sodium hypochlorite or other algaecide and rinse with
water. Tack down curled and lifted seams flush with the
surface.
Fill any gaps with silicon impregnated latex
caulk. Any loose pieces should be gently lifted and
glued down with roofing cement.
Application:
The
best method to assure good penetration of the first coat onto
the surface is by the application with a 3/4 inch nap
roller. The succeeding coats may be spray or roller
applied.
Multiple thin coats are preferable to
one thick coat.
Allow the coating to cure thoroughly
before applying the next coat, 1 to 8 hours depending on wind,
humidity and temperature conditions.
DO not apply if
rain is imminent within four (4) hours after application
or less than four (4) hours before the dew
settles.
Estimated coverage for 20 mil thickness 2
gallons per 100 square feet