Transformer Network Box
DOWNLOAD PDF
Case History #033 REV.04-97
Underground transformers subjected to corrosion due to ground water seepage. Transformer casings were sent to ARCOR’s facility for coating. After plugging holes and taping threaded studs, these units were abrasive blasted. A base coat of ARCOR S-30 White was then applied followed by a top coat of S-30.Transformer casing as received. Unit abrasive-blasted to SSPC-SP10.Completed with two coats of ARCOR S-30.